Athletics Fields - 7/8/10

a few men working on a track

There were over 25 men working at the football field Thursday morning. 

a man using a drill to cut a hole in the ground

This worker trims the cement drain that was poured along the perimeter of the field. 

a drainage grate on a track

The finished product for the drains.  The turf field will have just enough grade for rainwater runoff.

a man in a hard hat using a hoe

Metal forms were used to hold the concrete drains in place.  This worker cleans the forms before removing them from the field.

a concrete drain with a hole in the ground

The hole to the left of this drain will connect one of the many trench drains that will run under the TurfField. 

a truck in a dirt field

Located on the visitor sideline, this trench will eventually serve as the site for the long jump runway and pit.

several cylindrical objects wrapped in plastic

A few of the pipes that will be installed.

a manhole with a hole in the ground

This is one of the old sewers, located on the northeast corner of the field.  These will be capped several feet below the grade and covered with Turf.

a concrete pipe in the ground

One of the new cement sewers that will be placed in the corners of the field.

a concrete ring with holes in it

This new drain provided by Millennium Concrete was made specially for Wabash, judging from the print on the concrete.

a stadium with empty seats

New supplies are arriving every day.  The project is anticipated to be completed by August 9th. 