Phi Kappa Psi Renovation June 16, 2006

a construction site with a brick wall

The new east patio area looking south.

a staircase leading to a building

New stairs leading up to the new vestibule from the new east patio.

a man working on a building under construction

Looking into the new vestibule.  This will be the new main entrance into the Phi Psi house.

a room with many tools and equipment

New restrooms being installed on the lower level.

a construction site with several white pillars

New restroom plumbing for the lower level restrooms.

a construction site with a sign on the wall

Looking out of the old "Wally" room towards the new front vestibule.

a ladder in a room with a few windows

Work on the third floor begins.

men in a room with a wall covered in cement

Where these workers are standing will be a new restroom area on the third floor.

a construction site with a bulldozer and a bulldozer

Looking out onto West Wabash from the third floor.

a building under construction with a crane

The temporary central air for the study rooms.  These rooms will all have new windows and new heating and cooling units.

a building with a scaffolding on top of it

Looking towards the back of the house.