| Baseball Field Construction - Oct. 7, 2010 | ![]() |
|||||||||||
![]() |
| |||||||||||
The LaserDozer is back! The new field will have a slight grade (about 1 degree per 100 feet) to assist with drainage. The laserdozer makes certain each portion of the field has the proper grade before the sod crew can go to work. |
|