Baseball Field Construction - Oct. 7, 2010  
 

The LaserDozer is back! The new field will have a slight grade (about 1 degree per 100 feet) to assist with drainage. The laserdozer makes certain each portion of the field has the proper grade before the sod crew can go to work.

 
download high-res
Email this album